Posts By: Graham lingham

Control system

We have been awarded a 25k design and build control panel project to control the original ventilation system which has never operated correctly since the installation in 1991, Electrical Engineers Colin peacock and Kay controls will work closely to provide a retro fit panel complete with a cylon building management system to provide intelligent control.

Jerwood Gallery

The Jerwood Gallery was opened in 2012 at a cost of 4 million pounds, the building was designed to be energy efficient with the latest solar and ground source heat pump technology. A grey water system was installed to provide water to flush toilets, unfortunately the designers did not install any filtration system resulting in… Read more »

Breaking News

Environmental Maintenance Services have been shortlisted to update the heating systems for Castle Hill Academy, Addington, a £330k project to be completed prior to the heating season. The project involves stripping out the existing single pipe heating flow and installing three inch flow and return pipework, installing in excess of 130 Low Surface Temperature radiators, four… Read more »

Latest News

Environmental Maintenance Services have been shortlisted to update the heating systems for Castle Hill Academy, Addington, a £330k project to completed…