Control system

We have been awarded a 25k design and build control panel project to control the original ventilation system which has never operated correctly since the installation in 1991, Electrical Engineers Colin peacock and Kay controls will work closely to provide a retro fit panel complete with a cylon building management system to provide intelligent control.

Share this post
  •  
  •  
  •  
  •  

Leave a Reply

  • (will not be published)

XHTML: You can use these tags: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>